Solar PV Levelized Cost of Electricity (LCOE
### Energy Economics & Renewable Power: Levelized Cost of Electricity (LCOE) LCOE is the universal metric used by the Department of Energy (DOE) and energy traders to compare the lifetime cost per.
⚙ Input Values
📊 Results
Embed on Your Website
Copy and paste this code into your website.
<iframe src="https://calcusolve.com/calculator/solar-pv-lcoe-calculator?embed=true" width="100%" height="600" frameborder="0" loading="lazy" title="Solar PV Levelized Cost of Electricity (LCOE"></iframe> ⚖ Scenario Comparison
What This Means For You
Saved Calculations
No saved calculations yet.
Click "Save" to bookmark your current result.
📐 Formula
💡 Practical Example
For example, evaluating a \(10.0\text{ kW-DC}\) solar installation costing \ (\(\$28,000.00\text{ CAPEX}\)) producing \(14,500\text{ kWh in Year 1}\) with \(0.5\%\text{ annual degradation}\), \(25\text{-year lifespan}\), \), and a \(6.0\%\text{ discount rate}\): The discounted lifecycle cost is \(\$30,301.00\) and discounted generation is \(176,145\text{ kWh}\). The Levelized Cost of Electricity (LCOE) is \}}\).
📖 About Solar PV Levelized Cost of Electricity (LCOE
Energy Economics & Renewable Power: Levelized Cost of Electricity (LCOE)
LCOE is the universal metric used by the Department of Energy (DOE) and energy traders to compare the lifetime cost per unit of electricity produced across different power sources (Solar, Wind, Nuclear, Natural Gas, Coal):
- Discounting Energy and Capital: Because money and energy produced in year 25 is worth less in present value terms than money today, both financial cash flows and kilowatt-hours generated must be discounted using the project's Weighted Average Cost of Capital (WACC).
- Grid Parity Threshold: Grid parity is achieved when a renewable energy source can generate electricity at an LCOE equal to or lower than the local retail electricity rate from the utility grid.
How to Use This Calculator
Enter your System DC Capacity Rating (kW-DC) (e.g. 10.0 (10 kW residential or commercial solar array)), Turnkey Installed System Cost ( / Watt-DC) (e.g. 2.80 (2.80/W after or before incentives)), Year 1 Annual Solar Energy Generation (kWh / year) (e.g. 14,500), Annual PV Degradation Rate (%) (e.g. 0.5 (0.5% degradation per year)), System Economic Lifespan (Years) (e.g. 25 (Standard 25-year panel warranty)), Annual Operations & Maintenance Cost ( / kW / year) (e.g. 18 (18/kW-yr for cleaning, inverter reserve & monitoring)), and Real Discount Rate / Cost of Capital (WACC %) (e.g. 6.0 (6% weighted average cost of capital)). Results update instantly as you type — adjust any value to compare scenarios.
The Formula
National Renewable Energy Laboratory (NREL) LCOE equations:
Initial CAPEX (\) = System DC Capacity (kW) × 1,000 × Installed Cost (\/W)
NPV of Total Lifecycle Costs (\) = I_0 + Σ_t=1^N (O\&M_t) / ((1 + r)^t)
Lifetime Discounted Generation (kWh) = Σ_t=1^N E_0 × (1 - d)^t-1(1 + r)^t
LCOE (\/kWh) = (NPV of Total Lifecycle Costs) / (Lifetime Discounted Generation (kWh))
LCOE (\/MWh) = LCOE (\/kWh) × 1,000
Worked Example
For example, evaluating a 10.0 kW-DC solar installation costing \ (\28,000.00 CAPEX) producing 14,500 kWh in Year 1 with 0.5\% annual degradation, 25-year lifespan, , and a 6.0\% discount rate: The discounted lifecycle cost is \30,301.00 and discounted generation is 176,145 kWh. The Levelized Cost of Electricity (LCOE) is \.
Understanding Your Result
Evaluate your result in the context of your specific use case and relevant industry standards or reference values. A single calculated result is a starting point — test two to three scenarios to understand how sensitive the outcome is to your key input assumptions. For high-stakes decisions, verify your result against a secondary source or subject-matter expert before acting.
💡 Methodological Standards & Calculation Accuracy
- All calculations are performed client-side in your browser using verified, standards-compliant mathematical algorithms.
- Results are provided for educational and informational analysis; verify critical applications with certified domain specialists.
- Ensure input values are entered in consistent units matching the selector options to guarantee accurate outputs.
- Periodic recalibration is recommended whenever baseline assumptions, operating parameters, or external conditions change.
Results are for informational and educational purposes only. Always verify critical decisions with a qualified professional.