Solar PV Levelized Cost of Electricity (LCOE

Household Free Instant Private
Household

### Energy Economics & Renewable Power: Levelized Cost of Electricity (LCOE) LCOE is the universal metric used by the Department of Energy (DOE) and energy traders to compare the lifetime cost per.

Reviewed by Ahmad Faraz · BSCS
Last updated:
Editorial Guidelines

⚙ Input Values

📊 Results

Solar PV LCOE Summary
LCOE: 17.10¢/kWh ($171.0/MWh) ➔ CAPEX: $28,000 | Lifetime Gen: 341,561 kWh | Savings: -1.10¢/kWh vs Grid | Status: ABOVE GRID RATES
Levelized Cost of Electricity (¢ / kWh [LCOE])
17.10 ¢ / kWh
Levelized Cost of Electricity ($ / MWh [LCOE])
$170.98 / MWh ($0.1710 / kWh)
Initial Turnkey Capital Expenditure ($ CAPEX)
$28,000.00 ($2.80 / Watt)
Lifetime Discounted Generation Output (kWh)
177,222 kWh Discounted (341,561 Gross kWh)
Lifetime Discounted Total Project Cost (NPV Costs $)
$30,301.00 (CAPEX + Discounted O&M)
Grid Parity Evaluation (vs 16.0¢ / kWh Utility Grid)
ABOVE GRID RATES (17.10¢ > 16¢/kWh grid). Solar LCOE exceeds retail grid power without subsidies.
✦ Renewable Energy Economics & LCOE Diagnostic
Solar PV Levelized Cost of Electricity (NREL SAM Financial Methodology | 10 kW-DC | $2.80/W CAPEX | 25 Yr Lifespan @ 6.0% Discount Rate): [1. Unit LCOE Metric]: Over a 25-year operating lifetime with 0.5% annual degradation, the solar installation delivers a **Levelized Cost of Electricity (LCOE) of 17.10¢ per kWh ($170.98 per MWh)**. [2. Capital & Lifecycle Costs]: Across an **Initial Turnkey CAPEX of $28,000** and discounted O&M totaling $2,301, total lifecycle discounted costs are **$30,301**. [3. Generation & Parity]: Generates **341,561 total kWh (177,222 discounted kWh)**, generating electricity at a **-1.10¢/kWh discount** compared to prevailing 16.0¢/kWh retail utility grid power.
Embed on Your Website

Copy and paste this code into your website.

<iframe src="https://calcusolve.com/calculator/solar-pv-lcoe-calculator?embed=true" width="100%" height="600" frameborder="0" loading="lazy" title="Solar PV Levelized Cost of Electricity (LCOE"></iframe>

📐 Formula

National Renewable Energy Laboratory (NREL) LCOE equations:
Initial CAPEX (\) = System DC Capacity (kW) × 1,000 × Installed Cost (\/W)
NPV of Total Lifecycle Costs (\) = I_0 + Σ O&M_t(1 + r)^t
Lifetime Discounted Generation (kWh) = Σ E_0 × (1 - d)^t-1(1 + r)^t
LCOE (\/kWh) = NPV of Total Lifecycle CostsLifetime Discounted Generation (kWh)
LCOE (\/MWh) = LCOE (\/kWh) × 1,000

💡 Practical Example

✅

For example, evaluating a \(10.0\text{ kW-DC}\) solar installation costing \ (\(\$28,000.00\text{ CAPEX}\)) producing \(14,500\text{ kWh in Year 1}\) with \(0.5\%\text{ annual degradation}\), \(25\text{-year lifespan}\), \), and a \(6.0\%\text{ discount rate}\): The discounted lifecycle cost is \(\$30,301.00\) and discounted generation is \(176,145\text{ kWh}\). The Levelized Cost of Electricity (LCOE) is \}}\).

📖 About Solar PV Levelized Cost of Electricity (LCOE

Energy Economics & Renewable Power: Levelized Cost of Electricity (LCOE)

LCOE is the universal metric used by the Department of Energy (DOE) and energy traders to compare the lifetime cost per unit of electricity produced across different power sources (Solar, Wind, Nuclear, Natural Gas, Coal):

  • Discounting Energy and Capital: Because money and energy produced in year 25 is worth less in present value terms than money today, both financial cash flows and kilowatt-hours generated must be discounted using the project's Weighted Average Cost of Capital (WACC).
  • Grid Parity Threshold: Grid parity is achieved when a renewable energy source can generate electricity at an LCOE equal to or lower than the local retail electricity rate from the utility grid.

How to Use This Calculator

Enter your System DC Capacity Rating (kW-DC) (e.g. 10.0 (10 kW residential or commercial solar array)), Turnkey Installed System Cost ( / Watt-DC) (e.g. 2.80 (2.80/W after or before incentives)), Year 1 Annual Solar Energy Generation (kWh / year) (e.g. 14,500), Annual PV Degradation Rate (%) (e.g. 0.5 (0.5% degradation per year)), System Economic Lifespan (Years) (e.g. 25 (Standard 25-year panel warranty)), Annual Operations & Maintenance Cost ( / kW / year) (e.g. 18 (18/kW-yr for cleaning, inverter reserve & monitoring)), and Real Discount Rate / Cost of Capital (WACC %) (e.g. 6.0 (6% weighted average cost of capital)). Results update instantly as you type — adjust any value to compare scenarios.

The Formula

National Renewable Energy Laboratory (NREL) LCOE equations:

Initial CAPEX (\) = System DC Capacity (kW) × 1,000 × Installed Cost (\/W)

NPV of Total Lifecycle Costs (\) = I_0 + Σ_t=1^N (O\&M_t) / ((1 + r)^t)

Lifetime Discounted Generation (kWh) = Σ_t=1^N E_0 × (1 - d)^t-1(1 + r)^t

LCOE (\/kWh) = (NPV of Total Lifecycle Costs) / (Lifetime Discounted Generation (kWh))

LCOE (\/MWh) = LCOE (\/kWh) × 1,000

Worked Example

For example, evaluating a 10.0 kW-DC solar installation costing \ (\28,000.00 CAPEX) producing 14,500 kWh in Year 1 with 0.5\% annual degradation, 25-year lifespan, , and a 6.0\% discount rate: The discounted lifecycle cost is \30,301.00 and discounted generation is 176,145 kWh. The Levelized Cost of Electricity (LCOE) is \.

Understanding Your Result

Evaluate your result in the context of your specific use case and relevant industry standards or reference values. A single calculated result is a starting point — test two to three scenarios to understand how sensitive the outcome is to your key input assumptions. For high-stakes decisions, verify your result against a secondary source or subject-matter expert before acting.

💡 Methodological Standards & Calculation Accuracy

  • All calculations are performed client-side in your browser using verified, standards-compliant mathematical algorithms.
  • Results are provided for educational and informational analysis; verify critical applications with certified domain specialists.
  • Ensure input values are entered in consistent units matching the selector options to guarantee accurate outputs.
  • Periodic recalibration is recommended whenever baseline assumptions, operating parameters, or external conditions change.

Results are for informational and educational purposes only. Always verify critical decisions with a qualified professional.

❓ Frequently Asked Questions

What is the Levelized Cost of Electricity (LCOE)?

LCOE represents the minimum price per kilowatt-hour at which electricity must be sold for an energy asset to break even over its entire operational lifetime.

What is the formula for calculating solar LCOE?

LCOE = (Total Net Present Value of Lifecycle Capital & Operating Costs) ÷ (Total Net Present Value of Lifetime Electricity Generated in kWh).

What is a good LCOE for residential and commercial solar?

Utility-scale solar achieves an LCOE of 3¢ to 5¢/kWh, while residential rooftop solar typically ranges from 12¢ to 18¢/kWh.

Why is solar panel degradation included in LCOE?

Silicon photovoltaic panels gradually lose about 0.5% of their energy generation capacity each year due to UV exposure and thermal cycling.

What is the discount rate in LCOE calculations?

The discount rate (often the Weighted Average Cost of Capital, or WACC) accounts for the time value of money and the cost of debt/equity used to finance the system.

Try Other Calculators